Proyecto

Rijk Zwaan SQC

  • Rijk Zwaan SQC
Location:The Netherlands
Surface:26 growth chambers
Cultivation:Research
Description:At Rijk Zwaan SQC, a completely new building has been realized for the application of a total of 26 growth chambers. Ten of the growth chambers are built around the offices, the so-called lab. The other sixteen chambers are built in the hall. The base of these chambers does not differ from each other, except that a lifting installation has been built in the hall to place the tables in the growth chambers.

Rijk Zwaan SQC

At Rijk Zwaan SQC, a completely new building has been realized for the application of a total of 26 growth chambers. Ten of the growth chambers are built around the offices, the so-called lab. The other sixteen chambers are built in the hall. The base of these chambers does not differ from each other, except that a lifting installation has been built in the hall to place the tables in the growth chambers.

From the work that Certhon is carrying out at Rijk Zwaan Fijnaart, Rijk Zwaan SQC ended up at Certhon for the full realization of the desired growth chambers. This involves the construction of the chambers, the installation of the climate computer, climatic installations and the electricity. Certhon is also responsible at Rijk Zwaan SQC as cold / heat supplier. The growth chambers in the lab were put into use at the end of 2017. It is expected that in February 2018 the other sixteen chambers of the hall will be done.

The 26 chambers are used for different applications, so no chamber is the same. There are, for example, different workspaces, cultivation rooms, but also an UV chamber. There are chambers that are delivered as empty space, but also chambers that already have a rack in it. All chambers are used to test Rijk Zwaan SQC’s own seeds and young plants and to do research on this. In the new building, space has been reserved for possible extension.

Plantee aquí su pregunta

¿Contactar directamente? Llame a +31 174 225080